[exclusive] — Tower Crane Dismantling Method Statement
Introduction
13. Emergency procedures
- Stop work on immediate hazard; inform site manager and safety officer.
- Emergency contacts listed (site first aider, emergency services).
- Rescue plan for suspended personnel or fall from height; trained rescue team available.
- Incident reporting and preservation of scene for investigation.
- Remove attachments – Operator cabin guarding, lights, wind indicators, lifting hook and auxiliary hook.
- Lower jib to ground (if derricking/luffing) – Not applicable for fixed jib; proceed with dismantling by auxiliary crane.
- Dismantle counter-jib:
Verify the ground bearing capacity for the mobile crane (assist crane). Ensure no new underground utilities or structures have been installed since the crane was erected. Exclusion Zones: tower crane dismantling method statement
The scope of work includes the complete dismantling of the tower crane, including the tower, slewing unit, jib, and counter jib. The work will be carried out in accordance with the manufacturer's instructions, relevant industry standards, and applicable regulations. Introduction 13
The following environmental considerations will be taken into account during the dismantling process: Stop work on immediate hazard; inform site manager