Geoss Good Practice For Installation Of Jacked Foundation Piles In Singapore May 2026

Good Practice Report: Installation of Jacked Foundation Piles in Singapore

1. Introduction

Jacked piling (also known as displacement piling) involves installing pre-cast concrete or steel piles into the ground using hydraulic jacks reacting against the weight of the rig or previously installed piles. In Singapore, jacked piles are widely used for:

5.4 Jointing and Splicing

| Step | Action | Control Parameter | | :--- | :--- | :--- | | 1 | Lower pile into jig. | Eccentricity < 10 mm. | | 2 | Apply initial seating load. | 10% of working load (WL). | | 3 | Commence continuous jacking. | Rate: 0.5–1.5 m/min (max 2 m/min). | | 4 | Pause every 2 m for verticality check. | Deviation < 1:200. | | 5 | At termination: Hold for 30 s. | Pressure decay < 5%. | Static load tests (commonly maintained load or Osterberg

End of Article

Good Practice Report: Installation of Jacked Foundation Piles in Singapore

1. Introduction

Jacked piling (also known as displacement piling) involves installing pre-cast concrete or steel piles into the ground using hydraulic jacks reacting against the weight of the rig or previously installed piles. In Singapore, jacked piles are widely used for:

5.4 Jointing and Splicing

| Step | Action | Control Parameter | | :--- | :--- | :--- | | 1 | Lower pile into jig. | Eccentricity < 10 mm. | | 2 | Apply initial seating load. | 10% of working load (WL). | | 3 | Commence continuous jacking. | Rate: 0.5–1.5 m/min (max 2 m/min). | | 4 | Pause every 2 m for verticality check. | Deviation < 1:200. | | 5 | At termination: Hold for 30 s. | Pressure decay < 5%. |

End of Article